Control Unit ELC500
Discontinuation plan
|
September 30, 2024 |
|
|
System Configuration
Example of system configuration – For power peak-cut and operation monitoring
(1) |
Measurement of power demand |
(2) |
Demand monitoring at intervals of several seconds |
(3) |
Collection and storage of production / power information |
(4) |
Acquisition of production information from PLC and energy information collected by ELC500 Control Unit through Ethernet |
(5) |
Sharing of demand information via Ethernet and providing demand control |
(6) |
Collection of information from ELC500 Control Unit via Ethernet |
(7) |
Demand monitoring(Note) at intervals of several seconds using Web server |
(8) |
Compilation, analysis and sharing of information by linking with EnerVisualizeR |
Note: |
Screen must be created using Control Web Creator. |