【Notification of Manufacturer Change for Panasonic Industrial Devices SUNX Products and Panasonic Industrial Devices SUNX Tatsuno Products】
From April 1, 2024, the terms "Panasonic Industrial Devices SUNX Co., Ltd." and "Panasonic Industrial Devices SUNX Tatsuno Co., Ltd."
in this page and in the manuals and other documents to be downloaded will all be replaced with "Panasonic Industry Co., Ltd." and applied accordingly.
Control Unit ELC500
Discontinuation plan
|
September 30, 2024 |
|
|
System Configuration
Example of system configuration – For power peak-cut and operation monitoring
(1) |
Measurement of power demand |
(2) |
Demand monitoring at intervals of several seconds |
(3) |
Collection and storage of production / power information |
(4) |
Acquisition of production information from PLC and energy information collected by ELC500 Control Unit through Ethernet |
(5) |
Sharing of demand information via Ethernet and providing demand control |
(6) |
Collection of information from ELC500 Control Unit via Ethernet |
(7) |
Demand monitoring(Note) at intervals of several seconds using Web server |
(8) |
Compilation, analysis and sharing of information by linking with EnerVisualizeR |
Note: |
Screen must be created using Control Web Creator. |
Return to top
Return to top